Location: Atlanta, GA
Client: Atlanta Public Schools
North Atlanta High School underwent a major renovation. The general contractor chose to hire ATS Waypoint as a third-party commissioning agent to verify the operation of the mechanical system. The project had a very short duration since it was completed over the summer break. The commissioning took place as soon as systems were put into operation and verified. The project was completed on time and has had zero callbacks regarding the mechanical and controls systems.